Prior to the adoption of 18.25.004 (Ord. 2038) on 04/01/2002, Section 18.25.004 read as follows.

which a permit is required    25.00
    Minimum
(a)    1st $1,000 of the cost    5.00
(b)    Each additional $1,000 cost or fraction thereof     2.00